Fitting a new bathroom in a Fulham flat takes us much the same time on site as it would in a house — somewhere in the region of two-and-a-half to four weeks from strip-out to sign-off — but a flat has a way of adding time before we ever lift a tool, and it is the consent, the access and the shared drainage, rather than the building work itself, that tend to decide when you will actually be using the room.
The build itself runs to the same clock as a house, assuming the suite stays roughly where it is, and we have written up that day-by-day sequence in our Fulham bathroom timeline guide. What is easy to underestimate with a flat is everything that has to happen first, because the freeholder or managing agent may need to be told, and sometimes to give written consent, before anyone touches the plumbing, and that approval has a habit of sitting quietly on the critical path while you are busy choosing tiles.
Mostly because a leasehold flat brings other people into the schedule. Most leases ask you to notify the freeholder before you alter the pipework, some ask for formal sign-off, and until that is in hand there is a limit to how much of the rest can be nailed down — which is why we tend to start that conversation early rather than leave it running alongside the order for the suite.
A few things that rarely trouble a house. A shared soil stack means that moving a WC or a basin involves tying into drainage the other homes rely on, which quietly narrows where things can go; waterproofing stops being a nicety and becomes essential when there is a home directly below, since proper tanking is as much about protecting your neighbour from a leak as protecting you; and the ordinary business of getting a bath up three flights and a skip's worth of rubble back down takes a little planning, particularly where a lift has its own booking rules. None of it is difficult, but all of it asks for time a house simply does not.
More often than not, yes, at least in some form. Most leases carry an alterations clause covering changes to pipework and waste, and while a straight like-for-like replacement is frequently fine with notice, moving the soil connection or adding underfloor heating can tip it into needing consent — so it is worth a look at the lease early, when a delay costs you nothing more than a phone call. If you are still shaping what you want, our planning guide walks through the handful of things that most often catch people out.
If you are planning a new bathroom in a Fulham flat, send us the building details and we will flag the access and consent questions early, so they are sorted long before they can hold anything up.
"Works all looks great - super happy with it."
"Thank you very much for attending to this urgent job so quickly!"
"I would like again to express my gratitude for the hard work and professionalism, you have met all our requests with a positive attitude and went the extra mile for us."
"Many thanks for completing all of the jobs so perfectly. It has been a pleasure to deal with you & Fulham BM."
"Again, a big thanks to you and your team for the work completed today."
"I have just renovated the living room, and I am impressed with the work done.
The team installed an in-wall extension socket as part of a wider renovation, and the finish is absolutely seamless.
The socket sits perfectly flush, the plastering is smooth, and everything was left spotlessly clean. Professional, punctual, and would highly recommend to anyone looking for quality building work."

We are accredited members of the following organisations:


Copyright © Fulham Building and Property Maintenance Ltd. 2026 / This website has been proudly designed and built by J4G Design Ltd
We are proud to supporters of Cancer Research UK and the Guide Dogs for the Blind Association